Indiana, Ohio, commercial construction, indianapolis construction, build out, retail build out, commercial remodel, construction safety, construction budget, project management, Planet Fitness, Lilly, Scott Andrews Indiana, Ohio, commercial construction, indianapolis construction, build out, retail build out, commercial remodel, construction safety, construction budget, project management, Planet Fitness, Lilly, Scott Andrews Indiana, Ohio, commercial construction, indianapolis construction, build out, retail build out, commercial remodel, construction safety, construction budget, project management, Planet Fitness, Lilly, Scott Andrews

Client Stories

Planet FitnessPlanet Fitness, multiple locations in Indiana and Ohio

All brand-new facilities approx. 22,000 sf for each facility. Including new work out areas with the latest high-tech equipment, a 30 minute workout area, an abs and stretching area. Also complete with 2 fully functional locker rooms, a tanning and massage area were also included

Camp Bow WowCamp Bow Wow (Carmel, IN)

A 7,000 sf build out completed in 8 weeks, the contract amount was approximately $120,000, Featuring fully functional dog kennel area, indoor and outdoor play areas for the dogs, a grooming room with special showering area, new offices, and break room were installed. This build-out followed the franchise specifications with no problems.

Baskin RobbinsBaskin Robbins (Indianapolis, IN)

Build out of a 1,500 sf new store space, contract was approximately $90,000, equipped with new restrooms, freezer area, back room, front service line for customers, and a seating area. This project was built to the franchise specifications and opened before their scheduled opening day.

Eli Lilly CompanyEli Lilly Building 314 (Indianapolis, IN)

35 million dollar project, existing 300,000 sf 5 story building, located on their south campus, complete demolition of interior walls, flooring, ceilings, and mechanical and electrical, this facility allowed Lilly to produce products in half the time, state of the art laboratories, offices, and conference rooms, as well as clean rooms, and meeting areas.

Emmis CommunicationsEmmis Communications Headquarters (Indianapolis, IN)

50 million dollar project, a 10 story concrete structure that would house all of Emmis Communications radio and TV station studios, as well as executive offices, and a connector from Monument Circle to the Circle Center Mall.

BMV- Indiana Bureau of Motor VehiclesBMV- Bureau of Motor Vehicles (Lebanon, IN)

Build out of a 1,500 sf new store space, contract was approximately $90,000, equipped with new restrooms, freezer area, back room, front service line for customers, and a seating area. This project was built to the franchise specifications and opened before their scheduled opening day.

Depauw UniversityDepauw University Longden Hall (Greencastle, IN)

4 million dollar project, complete removal of mechanical, electrical, flooring, some interior walls, installed new carpet, paint, ceilings, electrical system, air conditioned rooms, gathering rooms, and common area's, this project was completed in one summer in time for the students to return the following fall.

Childrens Museum- IndianapolisThe Children's Museum (Indianapolis, IN)

4 million dollar project, complete removal of old kitchen and seating area, new food court with 6 separate restaurants, new terrazzo flooring and spacious seating area, complete with outside seating patio.

Indianapolis Chamber of CommerceIndiana Chamber of Commerce (Indianapolis, IN)

A complete remodel of their 21,000 sf space on the 8th floor of the PNC tower. This was a challenge due to the fact the tenant remained in the space during the remodel process. Certain areas were walled off for construction and the tenant moved into these spaces before moving on to the next section of construction. All new floor plan layout including bathroom remodels, all office suites remodels, making a bigger break room and conference rooms. New reception area with new desk, and we doubled the size of their copy room.